Audrey’s Oubliette :: My various projects, thoughts and ideas

Audrey’s Oubliette

Shellendrak is based and on hold

January 2nd, 2008

So I started working on Shellendrak manor and have a nice begining. The 1st floor of the manor has been glued onto gator foam. This floor has been the largest I have assembled yet. It was assembled out of 7 separate pieces. Using the low tack painters tape has helped out a ton on these multi-piece buildings. Instead of having to glue down 7 separate pieces individually I assemble all of them at one time using the painters tape and then spray mounted it to the gator foam all in one go. I also have finished the photoshop work on the 1st level walls for the outside and most of the inside. I am looking forward to see the first floor built.

Unfortunately the Shellendrak manor has now been put on hold. Cold Wars is coming up and I need to finish some other scenery, plus paint some figures for the two scenarios I will be running. Neither of which use the manor. Maybe the next convention. So for now it will be put aside for more important stuff. But it will be built.

shellm-tapedfloor.jpg

Leave a Reply

You must be logged in to post a comment.